Here is an updated picture with the track lights installed. There are 12 light fixtures so far. There will be many MANY more added over time. - Jason Now we're talking!! Lighting is big. I only asked, but knew you would install something nice.
|
|
|
Post by rockymountaineer on Jul 28, 2020 0:59:06 GMT
Jason,
I hope you don't mind me saying so, but I see elements of Rich Battista's Black Diamond Rwy and Norm Charbanneua's (sp?) layout in your track plan. Should make for a very satisfying RR. Plus LOTS of great opportunities for terrific photographs and videos!!!
|
|
|
Post by jdstucks57 on Jul 28, 2020 2:44:54 GMT
Jason,
I hope you don't mind me saying so, but I see elements of Rich Battista's Black Diamond Rwy and Norm Charbanneua's (sp?) layout in your track plan. Should make for a very satisfying RR. Plus LOTS of great opportunities for terrific photographs and videos!!!
Correct. I have no shame in saying the track plan is heavily inspired by Rich Battista's layout. My current layout is modeled after his as well. My engine facility is similar to Norm's in the way its laid out I suppose. Wasn't intentional. But I suppose it happened subconsciously after following his layout for so long. - Jason
|
|
|
Post by stevemaz555 on Jul 28, 2020 14:34:58 GMT
Nice Jason! I am in a similar space as noted above, maybe a few months ahead. Drywalled and sprayed the ceiling late last year. Assembled the modular tables early this year and now crawling along due to summer activities. Good luck and look forward to updates or D3R event. Attachments:
|
|
|
Post by jdstucks57 on Jul 28, 2020 15:35:52 GMT
Nice Jason! I am in a similar space as noted above, maybe a few months ahead. Drywalled and sprayed the ceiling late last year. Assembled the modular tables early this year and now crawling along due to summer activities. Good luck and look forward to updates or D3R event. Wow! Almost feels like I'm looking at my own basement! Nice job on finishing everything. Love seeing bench work go up for a new layout - Jason
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Jul 28, 2020 16:28:18 GMT
Jason and Steve - you two have me wanting to tear my bar out to get more room in the traincave. The only draw back would be third time starting a layout build in 7ish years! My guess ... the wife would not be happy with the idea!
|
|
|
Post by JDaddy on Jul 28, 2020 16:34:52 GMT
Whoa, Whoa... Whoa. What was that ?! Standard gauge? Was Mark Sarver at your house?
|
|
|
Post by stevemaz555 on Jul 28, 2020 19:19:49 GMT
60% O gauge on two levels (working on adding second level now) including a nice 40% dedicated tinplate section of standard gauge with a loop around the exterior of the whole thing and all the wonderment of that era with the accessories. The power station will be on the second level due to space. Only thing left someday is a tinplate monorail. Yes, Mark will be made aware once we are fully functional. In the wiring phase still. Attachments:
|
|
|
Post by JDaddy on Jul 29, 2020 0:17:12 GMT
Steve - There is so much Standard going around for such great prices... I am going to have to pick up a set! Then bring it over to your house for a spell!
|
|
|
Post by stevemaz555 on Jul 29, 2020 1:19:39 GMT
Careful, Tinplate is like crack.
|
|
|
Post by stevemaz555 on Jul 29, 2020 1:22:38 GMT
Plus I am not down the street from you in Milford anymore, now an East-sider by Greg
|
|
|
Post by MichRR714 on Jul 29, 2020 19:51:10 GMT
Jason just keeps humming along with the basement. It won't be too long until I'll be running that GT train I have in mind in his basement!
|
|